Analysis of the Impact of One-Pass Full-Section Construction for Multiple Bifurcations in an Underground Ventilation Station: A Case Study of the Yangtze River Road South Extension Project, Phase II of the Suzhou International Rapid Logistics Corridor
NIU Rui, WANG Anyuan, ZHA Chencheng, LI Naiyi, JIANG Tianqian, LIN Chao, ZHANG Zhiguo
STRUCTURAL ENGINEERS . 2025, (6): 185 -192 .  DOI: 10.15935/j.cnki.jggcs.202506.0020