Analysis of the Impact of One-Pass Full-Section Construction for Multiple Bifurcations in an Underground Ventilation Station: A Case Study of the Yangtze River Road South Extension Project, Phase II of the Suzhou International Rapid Logistics Corridor

NIU Rui, WANG Anyuan, ZHA Chencheng, LI Naiyi, JIANG Tianqian, LIN Chao, ZHANG Zhiguo

STRUCTURAL ENGINEERS ›› 2025, Vol. 41 ›› Issue (6) : 185-192.

PDF(2448 KB)
PDF(2448 KB)
STRUCTURAL ENGINEERS ›› 2025, Vol. 41 ›› Issue (6) : 185-192. DOI: 10.15935/j.cnki.jggcs.202506.0020
Engineering Construction

Analysis of the Impact of One-Pass Full-Section Construction for Multiple Bifurcations in an Underground Ventilation Station: A Case Study of the Yangtze River Road South Extension Project, Phase II of the Suzhou International Rapid Logistics Corridor

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}. {{journal.qiKanMingCheng_EN}}. 2025, 41(6): 185-192 https://doi.org/10.15935/j.cnki.jggcs.202506.0020

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(2448 KB)

Accesses

Citation

Detail

Sections
Recommended

/