Research on Segmented Cable Replacement Scheme for Long-Span Cable-Stayed Bridges Based on Current Cable Forces
GAO Zhipeng
STRUCTURAL ENGINEERS . 2026, (3): 190 -198 .  DOI: 10.15935/j.cnki.jggcs.20250414.001