Performance of Socket Connections for Precast Bridge Columns Subjected to Axial Load

LÜ Xinjian, LI Tao, LIU Duo, CHENG Zhao, ZHANG Jiandong

STRUCTURAL ENGINEERS ›› 2022, Vol. 38 ›› Issue (6) : 7-14.

PDF(1347 KB)
PDF(1347 KB)
STRUCTURAL ENGINEERS ›› 2022, Vol. 38 ›› Issue (6) : 7-14.
Structural Analysis

Performance of Socket Connections for Precast Bridge Columns Subjected to Axial Load

  • LÜ Xinjian1, LI Tao1, LIU Duo2, CHENG Zhao3,*, ZHANG Jiandong2,4
Author information +
History +

Abstract

To investigate the performance of socket connections for precast columns subjected to axial load, through the nonlinear three-dimensional numerical approach, this paper introduced the details of the designed models and studied the effects of column embedment length, column surface texture, and grout strength on the connection performance. The results indicated that:the ABAQUS numerical model with the surface contact algorithm adequately captured the structural behavior of the socket connections;the specimen with round foundation and confining steel tubes was adequate to fully exercise the axial performance of socket connection; increasing of column embedment length increased the strength of the socket connection in a linear relationship, whereas it had negligible effect on the side shear stress of the socket connection; the socket connections with different column surface texture exhibited comparable axial performance; the connection strength was increased by only 11.4% with increasing the compressive strength of grout from 40 MPa to 80 MPa.

Key words

precast bridge column / socket connection / axial performance / numerical analysis / parametric study

Cite this article

Download Citations
LÜ Xinjian, LI Tao, LIU Duo, CHENG Zhao, ZHANG Jiandong. Performance of Socket Connections for Precast Bridge Columns Subjected to Axial Load. STRUCTURAL ENGINEERS. 2022, 38(6): 7-14

References

[1] 项贻强,竺盛,赵阳.快速施工桥梁的研究进展[J].中国公路学报,2018,31(12):1-27.
Xiang Yiqiang,Zhu Sheng,Zhao Yang.Research and development on accelerated bridge construction technology[J].China Journal of Highway and Transport,2018,31(12):1-27.(in Chinese)
[2] 王景全,王震,高玉峰,等.预制桥墩体系抗震性能研究进展:新材料、新理念、新应用[J].工程力学,2019,36(3):1-23.
Wang Jingquan,Wang Zhen,Gao Yufeng,et al.Review on aseismic behavior of precast piers:new material,new concept,and new application[J].Engineering Mechanics,2019,36(3):1-23.(in Chinese)
[3] 张子飏,邓开来,徐腾飞.预制装配式混凝土桥梁结构2019年度研究进展[J].土木工程与环境工程学报(中英文),2020,42(5):183-191.
Zhang Ziyang,Deng Kailai,Xu Tengfei.State-of-the-art review of prefabricated concrete bridge structures in 2019[J].Journal of Civil and Environmental Engineering,2020,42(5):183-191.(in Chinese)
[4] Kurama Y C,Sritharan S,Fleischman R B,et al.Seism ic-resistant precast concrete structures:state of the art[J].Journal of Structural Engineering,2018,144(4):03118001.
[5] Haber Z B,Saiidi M S,Sanders D H.Seismic performance of precast columns with mechanically spliced column-footing connections[J].ACI Structural Journal,2014,111(3):639-650.
[6] 魏红一,肖纬,王志强,等.采用套筒连接的预制桥墩抗震性能试验研究[J].同济大学学报(自然科学版),2016,44(7):1010-1016.
Wei Hongyi,Xiao Wei,Wang Zhiqiang,et al.Experimental study on seismic performance of precast bridge pier with grouted splice sleeve[J].Journal of Tongji University (Natural Science),2016,44(7):1010-1016.(in Chinese)
[7] Ameli M J,Parks J E,Brown D N,et al.Seismic evaluation of grouted splice sleeve connections for reinforced precast concrete column-to-cap beam joints in accelerated bridge construction[J].PCI Journal,2015,60(2):80-103.
[8] 葛继平,夏樟华,江恒.灌浆波纹管装配式桥墩双向拟静力试验[J].中国公路学报,2018,31(12):221-230,266.
Ge Jiping,Xia Zhanghua,Jiang Heng.Biaxial quasi-static experiment of precast segmental bridge piers with grouting corrugated pipe connection[J].China Journal of Highway and Transport,2018,31(12):221-230,266.(in Chinese)
[9] 贾俊峰,郭扬,宋年华,等.基于灌浆波纹管锚固连接的预制拼装RC墩柱抗震试验[J].中国公路学报,2018,31(12):211-220.
Jia Junfeng,Guo Yang,Song Nianhua,et al.Seismic testing of precast RC bridge pier columns anchored by grouted corrugated ducts[J].China Journal of Highway and Transport,2018,31(12):211-220.(in Chinese)
[10] 高婧,葛继平,林铁良.干接缝节段拼装桥墩拟静力试验研究[J].振动与冲击,2011,35(2):211-216.
Gao Jing,Ge Jiping,Lin Tieliang.Pseudo static test for pre-cast segmental bridge columns with dry joints[J].Journal of Vibration and Shock,2011,35(2):211-216.(in Chinese)
[11] 王志强,卫张震,魏红一,等.预制拼装连接件形式对桥墩抗震性能的影响[J].中国公路学报,2017,30(5):74-80.
Wang Zhiqiang,Wei Zhangzhen,Wei Hongyi,et al.Influences of precast segmental connector forms on seismic performance of bridge pier[J].China Journal of Highway and Transport,2017,30(5):74-80.(in Chinese)
[12] 王志强,张杨宾,蒋仕持,等.套筒连接的预制拼装桥墩抗剪性能试验[J].同济大学学报(自然科学版),2018,46(6):767-775.
Wang Zhiqiang,Zhang Yangbin,Jiang Shichi,et al.Experimental study of shear performance of precast segmental bridge piers with grouted splice sleeve[J].Journal of Tongji University (Natural Science),2018,46(6):767-775.(in Chinese)
[13] 贾俊峰,赵建瑜,张强,等.螺栓连接预制拼装 CFST桥墩抗震性能试验[J].中国公路学报,2017,30(12):242-249.
Jia Junfeng,Zhao Jianyu,Zhang Qiang,et al.Cyclic testing on seismic behavior of precast segmental CFST bridge piers with bolted connections[J].China Journal of Highway and Transport,2017,30(12):242-249.(in Chinese)
[14] White S,Palermo A.Quasi-static testing of posttensioned nonemulative column-footing connections for bridge piers[J].Journal of Bridge Engineering,2016,21(6):04016025.
[15] Haraldsson O S,Janes T M,Eberhard M O,et al.Seismic resistance of socket connection between footing and precast column[J].Journal of Bridge Engineering,2013,18(9):910-919.
[16] Mohebbi A,Saiidi M S,Itani A M.Shake table studies and analysis of a precast two column bent with advanced materials and pocket connection[J].Journal of Bridge Engineering,2018,23(7):04018046.
[17] 徐艳,曾增,葛继平,等.承插式预制拼装桥墩的最小合理承插深度[J].同济大学学报(自然科学版).2019,47(12):1706-1711.
Xu Yan,Zeng Zeng,Ge Jiping,et al.Minimum reasonable socket depth of precast pier-footing with socket connection[J].Journal of Tongji University(Natural Science),2019,47(12):1706-1711.(in Chinese)
[18] 曾增,王志刚,余坚,等.预制桥墩不同承插式连接构造试验研究[J].结构工程师,2020,36(5):89-94.
Zeng Zeng,Wang Zhigang,Yu Jian,et al.Testing of precast pier with different socket connection construction[J].Structural Engineers,2020,36(5):89-94.(in Chinese)
[19] Cheng Z,Sritharan S.An outdoor test of a prefabricated column-pile cap-pile system under combined vertical and lateral loads[J].Journal of Bridge Engineering,2020,25(8):04020052.
[20] Cheng Z,Sritharan S.Side shear strength of performed socket connections suitable for vertical precast member[J].Journal of Bridge Engineering,2019,24(5):04019025.
[21] 中华人民共和国住房和城乡建设部.GB 50010—2010 混凝土结构设计规范[S].北京:中国建筑出版社,2015.
Ministry of Housing and Ruban-rural Development of the People’s Republic of China.GB 50010—2010 Code for design of concrete structures[S].Beijing:China Architecture and Building Press,2010.(in Chinese)
[22] Jankowiak T,Lodygowski T.Identification of parameters of concrete damage plasticity constitutive model[J].Found Civ Environ Eng,2005,6:53-69.
[23] 秦浩,赵宪忠.ABAQUS混凝土损伤因子取值方法研究[J].结构工程师,2013,29(6):27-32.
Qin Hao,Zhao Xianzhong.Study on the ABAQUS damage parameter in the concrete damage plasticity model[J].Structural Engineers,2013,29(6):27-32.(in Chinese)
PDF(1347 KB)

1310

Accesses

0

Citation

Detail

Sections
Recommended

/