地下风机房多道分岔全断面一次性施工影响分析——以苏州国际快速物流通道二期工程长江路南延工程为例
牛瑞, 王安源, 查陈诚, 李乃义, 江天堑, 林超, 张治国
Analysis of the Impact of One-Pass Full-Section Construction for Multiple Bifurcations in an Underground Ventilation Station: A Case Study of the Yangtze River Road South Extension Project, Phase II of the Suzhou International Rapid Logistics Corridor
NIU Rui, WANG Anyuan, ZHA Chencheng, LI Naiyi, JIANG Tianqian, LIN Chao, ZHANG Zhiguo
结构工程师
.
2025, (6): 185
-192
.
DOI: 10.15935/j.cnki.jggcs.202506.0020