南京金融城二期C3塔楼地上49层、地下5层,建筑高度为188.6 m,采用型钢混凝土框架-混凝核心筒结构体系。塔楼平面为近似矩形,在41层楼面处平面收进为一半,为高位不对称立面收进的建筑。针对结构的不规则情况,采取相应的加强措施,提出符合结构特点的抗震性能目标,对整体结构进行了小震、中震及大震的分析,并针对结构的高位立面不对称收进的特点进行了详细的分析。分析结果表明,该结构设计安全可靠,抗震性能良好。
Abstract
C3 tower of Nanjing financial city Phase Ⅱ has 49 floors above the ground and 5 floors below the ground. The height of the building is 188.6m. The steel reinforced concrete frame and concrete core tube structure system is adopted. The plane of the tower is approximately rectangular, half of which set back at the 41th floor. C3 tower is a building with high-position asymmetric elevation retraction. According to the irregularities of the structure, the corresponding strengthening measures are taken,and the seismic performance target in accordance with the characteristics of the structure is set. The frequent earthquake, design earthquake and rare earthquake of the structure are analyzed. In addition, the high-position asymmetric retraction of the structure is analyzed in detail. Analysis results show that the structure design is safe and reliable with good seismic performance.
关键词
立面收进 /
超高层建筑 /
框架-核心筒 /
抗震性能
{{custom_keyword}} /
Key words
vertical setback /
super high-rise building /
frame-core wall /
seismic performance
{{custom_keyword}} /
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 中华人民共和国住房和城乡建设部.JGJ 3—2010 高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2010.
Ministry of Housing and Urban-Rural Development of the People's Republic of China. JGJ 3—2010 Technical specificatio for concrete structures of tall building[S].Beijing:China Building Industry Press,2010.(in Chinese)
[2] 徐培福,傅学怡,王翠坤,等.复杂高层建筑结构设计[M].北京:中国建筑工业出版社,2005.
Xu Peifu,Fu Xueyi,Wang Cuikun,et al.The design of complex high-rise building structure[M].Beijing:China Building Industry Press,2005.(in Chinese)
[3] 南京金融城二期东区C3塔楼结构超限审查报告[R].南京金融城二期东区C3塔楼结构超限审查报告[R].南京,2019.
Report on structural overrun of C3 tower in east area of Nanjing Financial City Phase II[R].Report on structural overrun of C3 tower in east area of Nanjing Financial City Phase II[R].Nanjing,2019.(in Chinese)
[4] 张博,吴晓涵,吕西林,等.立面收进超限结构弹塑性时程分析[J].结构工程师,2011,27(6):34-40.
Zhang Bo,Wu Xiaohan,Lü Xilin,et al.Elasto-plastic time history analysis of a super high-rise building with setback in elevation[J].Strutural Engineers,2011,27(6):34-40.(in Chinese)
[5] 苏宁粉,吕西林,周颖,等.某立面收进复杂高层建筑结构抗震性能评估[J].浙江大学学报(工学版),2012,46(10):1893-1899.
Su Ningfen,Lü Xilin,Zhou Ying,et al.Seismic behavior of super-tall building with setbacks in elevation[J].Journal of Zhejiang University(Engineering Science),2012,46(10):1893-1899.(in Chinese)
[6] 包联进,陈建兴,王鑫,等.退台式收进体型超高层建筑结构设计[J].建筑结构,2019,49(7):7-12.
Bao Lianjin,Chen Jianxing,Wang Xin,et al.Structural design of super-tall building with setback terraces[J].Building Structure,2019,49(7):7-12.(in Chinese)
[7] 周建龙. 超高层建筑结构设计与工程实跨[M].上海:同济大学出版社,2018.
Zhou Jianlong.Structural design and practise of super high-rise buildings[M].Shanghai:Tongji University Press,2018.(in Chinese)
{{custom_fnGroup.title_cn}}
脚注
{{custom_fn.content}}